Customization: | Available |
---|---|
After-sales Service: | Within 24 Hours |
Warranty: | 1 Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Segmental Method with a Segmental Launching Gantry (LG) is a very popular way used for the construction of bridges and viaducts with small curve and long span.
Segmental Launching Gantries are used for erecting Precast Segmental Bridges and it uses Balance Cantilever Method or Span by Span Method.
Launching Gantry can be designed as Underslung or Overhead Model to meet the site requirements.
Whenever Segmental Launching Gantry is use, efficiency is crucial. NANTE Heavy Industry Launching Gantries are designed to save every single minute in the construction sequence. Motorized mechanisms are used for continuous self-launching, electric winches with motorized travelling wagons are used for segment lifting and transporting, Spreader Beam with 360° on plane rotating, vertical tilting and angle adjustment functions are provided.
-------------------------------------------------------------Design and manufacturing features------------------------------------------------------------
Items | Lifting Mechanism | Item | Traveling Mehanism | Hook Rotation Mechanism | Main Leg Reverse Roller | Bottom Leg Reverse Roller | |||
Capacity(t) | 60 | Traveling Speed (m/min) | 0~10(Inverter) | 0.42r/min | 0~3(Inverter) | 3.47 | |||
Work Duty | Whole Machine A3 |
Lifting Mechanism M3 | Work Duty | M3 | |||||
Lifting Height(m) | 28 | Operating Air Pressure(kgf/m2) | ≤25 | ||||||
Lifting Speed(m/min) | 0~2(Heavy Load) 0~4(No load) |
Power Supply | 3P 380V 50Hz | ||||||
Power Supply | 3P 380V 50Hz | Rail Model | 80×40 | - | H Beam | H Beam | |||
Wire Rope Φ×Length | Φ20×375m | Wheel Φ | 360 | - | 240 | 240 | |||
Max kn×Reeving | 5t×(6+6) | Wheel Pressure (KN) | 210 | - | 150 | 25 | |||
Motor | Model | YZP200L2-6 | Motor | Model | YZPEJ90L-4 | YEJ80M1-4 | YZPEJ80M2-4 | YEJ71M1-4 | |
Power(KW) | 30 | Power(KW) | 1.5 | 0.55 | 0.75 | 0.25 | |||
RPM(r/min) | 980 | RPM(r/min) | 1420 | 1390 | 1390 | 1380 | |||
Qty. | 1 | Qty. | 4 | 2 | 16 | 4 | |||
Reducer | Model | ZQD850-141.73 | Reducer | Model | KF77-78.07 | XLED53-595 | KF57-90.26 | KF47-90.86 | |
Overall Gear Ratio | 141.73 | Overall Gear Ratio | 203.84 | 3343.33 | 350.42 | 299.3 | |||
Qty. | 1 | Moudle & Teeth | 2m=8,Z1=18 Z2=47 | 2/m=6,Z1=21 Z2=118 | 16/m=6,Z1=17 Z2=66 | 4/m=6,Z1=17 Z2=56 | |||
Braker | Model | YWZ4300/E80 | Braker | Model | - | - | - | - | |
Torque(N*m) | 750 | Braking Torque | 20 | 10 | 10 | 5 | |||
Pusher Model | Ed80/6 | Pusher Model | - | - | - | ||||
Qty. | 2 | Qty. | 4 | 2 | 16 | 4 |
Q1: Are you Manufacturer or Trading Company,